Practical steps facilities managers can take to audit HVAC systems


The Northern Hemisphere’s record-breaking summer has underlined an increasingly important challenge for facilities managers: can building heating, ventilation and air-conditioning systems continue to perform reliably as temperatures become more extreme? Summer 2026 was provisionally declared the hottest on record. The hottest temperature recorded in Canada during summer 2026, for example, was 41.2 °C, measured in Lytton, British Columbia, in July 2026. Taking another country, the UK, here Met Office data subsequently put the highest temperature of the summer at 38.2°C at Hartpury College on 13 August, following updated observations. Fifty-four weather stations also broke their all-time daily maximum temperature records. This is more than a meteorological footnote. Climate attribution analysis found that a summer like 2026 was made around 130 times more likely by human-induced climate change. Its projections indicate that summers will continue becoming hotter.

For facilities managers, that creates a practical engineering question. HVAC equipment may have been selected when today’s extremes were much less common. Higher external temperatures, prolonged cooling demand and changes in building occupancy can reveal weaknesses that remained hidden under less demanding conditions. The issue is therefore not simply whether the system works. It is whether it has sufficient performance margin to keep working effectively when demand rises.

Here are six practical checks.

Gather the HVAC system documentation

Start with what the building is supposed to do.

Bring together equipment specifications, schedules, commissioning information, drawings, manufacturers’ manuals, maintenance records, previous repairs and, where available, historical balancing or performance reports. This establishes a baseline against which current performance can be assessed. It might reveal, for example, that the building’s use, occupancy or cooling loads have changed significantly since the HVAC system was specified. Good documentation also makes professional investigation considerably easier. CIBSE’s Guide M: Maintenance engineering and management places operations and maintenance documentation, controls, commissioning, risk assessment and engineering condition surveys within the wider discipline of effective building-services maintenance. The aim should be to understand not only the age of the system, but its original design intent and whether today’s demands still sit comfortably within it.

Review controls and thermostats

Before assuming that cooling equipment is failing, check what it has actually been instructed to do. Review authorised temperature settings, time schedules, occupancy periods and seasonal operating strategies. An incorrectly adjusted thermostat or building management system schedule can create apparent performance problems when the underlying plant is working normally.

Modern controls also provide an opportunity to match HVAC operation more closely to occupancy. An office operating at substantially reduced occupancy during Christmas, for example, should not necessarily follow precisely the same operating pattern as during a normal working week. This does not mean making uncontrolled adjustments to a building management system. Facilities managers can check approved set-points, alarms and schedules, but changes affecting system operation should follow the organisation’s controls and be undertaken by competent personnel. This is increasingly important because modern controls have become integral to both maintenance and energy management. CIBSE guidance highlights controls, commissioning, training and energy-use data as important elements of contemporary facilities management.

Ask the building’s occupants

Technology does not provide the whole picture. Occupants can act as a distributed network of sensors, identifying areas that are consistently too warm or cold, rooms in which conditions deteriorate at particular times, unusual draughts, or locations where ventilation appears ineffective. A short survey can help turn anecdotal complaints into usable information. Ask about location, time of day and whether discomfort is persistent or intermittent. Compare the replies against orientation, solar gain, occupancy levels, opening windows and HVAC zoning.

Patterns matter. Complaints concentrated on a particular floor, façade or operating period provide a more useful starting point than an isolated statement that an office is “too hot”. Occupant feedback should therefore complement, rather than replace, engineering measurements.

Have filters and ductwork professionally inspected

Air cannot be conditioned effectively if it cannot move through the system as intended. Filters progressively accumulating material increase resistance to airflow. Duct leaks, damper problems, fouled coils and other restrictions may also compromise performance. The principle is important because reduced air delivery does not necessarily produce an immediate total system failure. Performance can decline gradually, reducing the engineering margin available when external temperatures or internal heat gains increase.

An internal 2026 HVAC assessment, for example, identified filter loading, fan degradation, increased system resistance, variable-speed-drive settings and air-balancing drift as possible contributors to declining airflow performance. HVAC issues 2026 also identified useful diagnostic checks including fan speed, static pressure, filter differential pressure and actual AHU airflow compared with design airflow. For ordinary commercial buildings, inspection and replacement frequencies should be governed by manufacturers’ instructions, operating conditions and measured performance rather than an arbitrary universal interval. CIBSE’s maintenance guidance similarly emphasises planned maintenance and competent personnel.

Compare actual energy performance

Energy data can provide another early warning. Rather than looking only at the latest electricity bill, compare consumption across genuinely comparable periods. Normalise the assessment, as far as practicable, for outside temperature, operating hours, occupancy and significant changes in building use. If energy consumption rises substantially while delivered comfort or cooling performance deteriorates, the combination deserves investigation.

Trend data are particularly valuable. Building management systems, smart meters and sub-metering can allow facilities teams to look for gradual changes rather than waiting for a component to fail outright. The objective is to establish whether more energy is being consumed to deliver the same, or worse, outcome. CIBSE guidance on efficient air-conditioning operation notes that inspections and energy audits can uncover operational inefficiencies and support better system performance.

Learn the HVAC warning signs

Some clues require little specialist equipment. Unusual noises, excessive vibration, repeated alarms, unusual odours, persistent temperature deviations, water where it should not be, or visible equipment damage should all trigger attention. Facilities managers can observe, document and report these conditions. They should not, however, dismantle equipment or undertake electrical or mechanical investigations for which they are not competent.

This distinction is important. CIBSE guidance stresses appropriate risk assessment, safe systems of work, competent maintenance personnel and adequate records. Observations should ideally be recorded with the asset involved, location, date, operating conditions and any associated BMS alarm. That turns a vague concern into useful diagnostic evidence.

If these checks identify significant problems, the next step should be a competent professional assessment. Depending on the findings, this could lead to servicing, rebalancing, controls optimisation, refurbishment or ultimately plant replacement. Facilities managers should also consider continuity during the work itself. If chillers, air-handling units or other critical equipment must be taken offline, temporary heating or cooling capacity can help bridge the gap while permanent repairs or upgrades are undertaken.

The bigger lesson from 2026 is that HVAC maintenance is becoming part of climate resilience. TLatest analysis suggests exceptionally hot summers are becoming considerably more probable due to changing climate. For building operators, waiting for equipment to fail during the next heatwave is therefore an increasingly expensive strategy. Documentation, trend analysis, occupant intelligence and planned engineering inspections provide something more useful: an opportunity to identify disappearing performance margin before it becomes operational disruption.



Practical steps facilities managers can take to audit HVAC systems

#Practical #steps #facilities #managers #audit #HVAC #systems

Leave a Reply

Your email address will not be published. Required fields are marked *